On January 6, Shijiazhuang Xinguan epidemic broke out and closed-loop control was implemented in the whole region. Comrade Ge Shuaitao, a party member of Hebei Branch, gave full play to the vanguard role of party members. Facing the production needs of customers, he innovated his working methods, met the urgent needs of customers, and won the favorable comments of customers with his enthusiastic service attitude and professional technology. He effectively achieved "the party flag is floating in the first line, the fortress is built, and the party members are in the first line".
According to the customers demand for delivering a batch of tank containers and multi-unit gas container products before the Spring Festival, Comrade Ge Shuaitao contacted the customer in the first place to determine the inspection requirements and specific inspection methods.
After understanding, among the more than 100 workers enclosed in the factory area during the epidemic, only some of the operators were able to participate in the production of tank containers and multi-unit gas container products. The technical force was seriously insufficient and needed to be transferred from other processes. In particular, there was no original process personnel in the frame assembly and welding process, and the site was not very familiar with the links from blanking to assembly to welding to testing to inspection. In response to this situation, Comrade Ge Shuaitao conducted video training for the quality director, on-site quality responsible personnel and on-site operation personnel, from raw material verification to confirmation of drawings, from component blanking to size confirmation, from beveling to component assembly positioning, from corner column spot welding to full welding to corner column tensile test requirements, from end frame assembly welding to frame assembly welding, from sanding requirements to final paint, the framework of the whole process of training. After training and follow-up on-site video tracking and confirmation guidance, the framework has been produced in an orderly manner and the quality has been guaranteed.
On January 29, the epidemic was relieved. After receiving the notice of unsealing, comrade ge shuaitao rushed to the enterprise as soon as possible to recheck and confirm the remote inspection products on the spot. he rechecked the assembly dimensions and the welding beads of the weak links in the frame production, especially the frame strength of hazardous chemicals. after rechecking, the product quality of the remote inspection met the requirements of relevant standards. The main person in charge of the customer gave a high evaluation of our work attitude and service.
As a party member, Comrade Ge Shuaitao takes the needs of customers seriously, especially the needs of special periods, overcomes difficulties through reasonable inspection methods, and ensures product quality, which fully reflects that party members are not afraid of hardships and dangers, charge ahead, and give full play to the vanguard and exemplary role of party members. He has fulfilled his original intention with actions and interpreted his mission with responsibility, Let the party flag fly high in the front line of epidemic prevention and control and enterprise resumption of work.
