Cn
  • Safety Assessment of Wind Turbine Life Extension
  • Evaluation of Wind Power Technical Reform
  • Post-evaluation of wind farm
  • GWO Training Service Assessment
  • Photovoltaic power station acceptance inspection
  • traffic product evaluation
Evaluate the health status, reliability, safety, key component life, remaining life of the unit, etc. of the wind turbine unit that has been in operation for several years, and give suggestions for subsequent rectification and regular inspection.

Before the technical renovation of the wind turbine, evaluate the technical renovation plan of the wind turbine, analyze the safety and risks of the technical renovation, and give the safety conclusion of the technical renovation plan; After the technical renovation of the prototype, the safety after the implementation of the technical renovation is evaluated and verified through actual measurement and data analysis and witness, and the effect of improving the power generation of the technical renovation is evaluated, so as to provide the basis for the owner to implement the subsequent technical renovation decision. It can be evaluated for various technical improvements such as unit power enhancement, controller localization, yaw wind, control system optimization, SCADA system optimization and upgrade, engine room radar wind measurement, etc.

Service Content

-Technical improvement plan review

-Verify and witness the effect of technological transformation

-Verify the security of technical transformation

After the wind farm project is completed and put into operation, a comprehensive and systematic review and summary of the project will be conducted, and the implementation process of the project and the final results and impact after the completion of the project will be comprehensively and systematically compared with the plans and objectives determined at the time of project decision-making, finding the differences, analyzing the reasons, drawing lessons, and proposing improvement suggestions.

GWO (International Wind Energy Organization) is an international organization initiated by global wind power manufacturers and operators. It is mainly committed to safe operation and injury-free work of wind power sites. Through safety training and practical activities, reduce risks and control risks to help the wind power industry Establish a harmless working environment. In recent years, GWO has established a set of perfect personnel training standard system based on rich wind power training and practical experience. CCSC can perform all 6 GWO standards, a total of 16 modules of the assessment work.

According to the requirements of the project owner or the entrusting party, after the construction of the photovoltaic power station is completed, it is clear whether the power station meets the relevant performance indicators and quality requirements through testing and inspection of equipment performance, power station efficiency, construction quality, process document filing and other aspects.

Service Content

-Component appearance inspection

-Component power detection

-Component EL detection

-Inverter conversion efficiency test

-Inverter power quality test

-Power station efficiency test

-Ground test & polarity test

-Phalanx insulation test

-Conformance testing

-Document filing check

-BOM verification of key equipment

-Installation quality inspection

In-use car paint booth, comprehensive safety evaluation of lifts, safety acceptance of electric car charging facilities, comprehensive survey of electric car charging stations, operation safety inspection of in-service charging facilities, operation and maintenance safety inspection of electric car quick-change power stations, functional safety evaluation of intelligent transportation products (monitoring, driving, gates, etc.), functional safety evaluation of rail transit [signal products (transponders, automatic train monitoring system ATS, automatic train operation system ATO, rail circuits, etc.), urban rail transit doors/platform doors/screen doors, etc.]].